Friday, 18 May 2012

Sub-Floor in Place

Busy couple of weeks.  Timber for the sub-floor arrived last Monday, and was in place by the end of the day.  Plumber then came in and ran pipes under the sub-floor over the next few days.




Tuesday this week insulation was installed in the floor.  This is required for houses not sitting on a concrete slab to allow us to meet the 6-star standard.




On Wednesday they placed the particleboard sub-floor.  They then measured for the ground floor frame, which is being built off site and will hopefully be here in a week.