Busy couple of weeks. Timber for the sub-floor arrived last Monday, and was in place by the end of the day. Plumber then came in and ran pipes under the sub-floor over the next few days.
Tuesday this week insulation was installed in the floor. This is required for houses not sitting on a concrete slab to allow us to meet the 6-star standard.
On Wednesday they placed the particleboard sub-floor. They then measured for the ground floor frame, which is being built off site and will hopefully be here in a week.